N.I.T. NO. : 02 / A.E /NKDA of 2011- 12.

31 May,2012

Construction of shallow surface drains and pits surrounding the play ground for draining out storm water at AD Block New Town Maintenance of saplings within the park at AD Block , New Town from 01.08